Cortex Console

Energy Autonomy & Asset Management

Victoria Manufacturing Hub • Cortex • OPC UA Server v2.4

Cortex Engine

Predictive Demand Response & Market Analysis

Real-time Site Energy Flow

Utility Grid

450 kW

BESS Storage

50 kW

Solar Array

120 kW

Main Site Load

620 kW

Power Factor ($\cos \phi$)

0.94

Acceptable

Voltage THD

2.1%

Std IEEE-519 (Max 5.0%)

Grid Frequency60.01Hz

Peak Shaving Active

Estimated monthly savings:

$2,450 CAD

Load Capped at 630kW

Power Demand Trends ($CAD Analytics)

TODAY
YESTERDAY

Active Alarms (3)

UPS-0114:23:45

UPS Battery Low - 15% remaining

CRITICAL
PROTECTION14:15:30

Phase Unbalance > 8% detected

HIGH
PF-CONTROLLER13:45:12

Power Factor dropping (0.89)

MEDIUM
BMS-0112:30:22

BESS Temperature 45°C

LOW
NETWORK11:45:18

Network latency > 200ms

MEDIUM

PLC Live Registers (Modbus TCP)

40001
Main Breaker
SUCCESS
CLOSED
40012
Grid Voltage
SUCCESS
13.2 kV
40125
Transformer Temp
SUCCESS
62.4°C
Limit: 85°C
40230
Phase Unbalance
SUCCESS
2.4%

Manual Control Override

Emergency Generator
Diesel backup 2MW
Capacitor Bank
Power Factor Correction
Load Shedding Mode

Cybersecurity Dashboard

Firewall Status
ACTIVE
24/7 monitoring enabled
VPN Connections
3 active
All connections verified
Intrusion Attempts
0 (last 24h)
No threats detected
Last Security Audit
All systems verified

Industrial Network Topology

PLC-01PLC
24ms
IP: 192.168.1.10
Last Seen
14:25:32
Modbus TCP
RTU-03RTU
45ms
IP: 192.168.1.12
Last Seen
14:25:30
DNP3
PROT-01Protection
18ms
IP: 192.168.1.15
Last Seen
14:25:31
IEC 61850
HMI-01HMI
120ms
IP: 192.168.1.20
Last Seen
14:24:55
OPC UA
GATEWAYGateway
32ms
IP: 192.168.1.1
Last Seen
14:25:33
Multiple
BMS-01BMS
28ms
IP: 192.168.1.25
Last Seen
14:25:29
CAN Bus

System Event Log (Last 24h)

14:25:12INFO
[PLC-01]Circuit Breaker 12A closed
14:24:55WARNING
[PROTECTION]Overcurrent relay trip reset
14:23:40SECURITY
[SCADA]Manual override activated
14:22:15ERROR
[RTU-03]Analog input AI04 out of range
14:21:30INFO
[BMS-01]Battery charge cycle started

Power Quality Analysis

THD Voltage
3.33%
Fundamental
Harmonics
H32.8%
H51.5%
H70.9%
H90.4%
ESG Compliance (GHG Protocol Scope 2)

12.4 t

CO2 Avoided Today

38%

Green Energy Mix

*Calculation based on BC Hydro low-carbon grid profile.
Standard Compliance

Real-time monitoring of IEEE 519-2022 power quality limits. Automated power factor correction and harmonic mitigation active via C-Logic edge processing.

Stakeholder View

CFO Perspective

Demand charges reduced by $480 this week.

Engineering Perspective

PF stable at 0.98. Zero transient events.

Operations Perspective

Facility capacity: 82%. Optimized for shift 2.